GTA's Complete Backyard Package — Starting at $100,000

This summer, your backyard is finished.

A complete luxury backyard: pool, patio, lighting, structure, and softscaping designed as one system, built by one team, and done in 4 weeks when your property qualifies.

  • Custom pool with integrated lighting and stone steps

  • Premium patio design and installation

  • Shelter structures — gazebo or PuraGola pergola

  • Softscaping with mature trees and plants

  • 4‑week completion guarantee (weather permitting)

  • No hidden costs — what you approve is what you pay

Promise to You

3-4 weeks Completion

Guarantee

Most backyard makeovers including interlock, stonework, pools, and outdoor kitchens are completed within 4-5 weeks of the start date, delivering your dream space faster than industry norms.

Premium Quality Work

Guarantee

Every project is completed with top‑grade materials, skilled craftsmanship, and a workmanship warranty that protects your investment for years to come.

No Hidden Costs

Guarantee

Transparent pricing from the start detailed proposals outline every element so there are no surprise fees or budget overruns.

If any issue arises, we respond within 24 hours. With Greenblock, your backyard transformation is completed by a trusted, proven team.

What’s Included in the $100,000 Package

A complete backyard makeover means everything is planned to work together — layout, structure, lighting, and planting — so it feels like one finished space, not a bunch of separate upgrades.

1) Pool (Core Feature)

Designed to fit your property and not dropped in. The pool is the centrepiece of the layout, positioned to work with how the rest of the space moves.

2) Patio / Hardscape Living Area

A finished outdoor living zone for dining, lounging, and entertaining. The foundation on which the whole space is built is not an afterthought.

3) Professional Lighting Package

Lighting that makes the backyard genuinely usable after sunset and turns a daytime space into an evening atmosphere.

4) Steps / Elevation + Transitions

Clean transitions and proper grade changes that make the space feel designed, not like a construction site that got "finished enough."

5) Shelter Structure (Gazebo or Pergola)

A pergola or gazebo that creates an outdoor room with real architecture. The feature that gives the backyard a destination, not just a perimeter.

6) Softscaping (Trees + Plants)

The trees and planting that make the space feel complete, private, and mature from day one, not bare dirt with a pool in it.

The 3-4 Week Guarantee

The 4-week guarantee applies when your property qualifies — based on scope fit, site access, and scheduling availability. If it doesn't qualify, we'll tell you that upfront and give you the most realistic timeline before anything gets signed.

How it works:

1. Request the Package. Tell us your GTA city and backyard goals. Takes 60 seconds. No call required upfront.

2. Qualification + Consult. We confirm whether your yard fits the package, walk you through what's included, and align on scope and selections before we start.

3. 2D Plan + Photorealistic 3D Rendering Before a single shovel hits the ground, you'll see exactly what you're getting.

4. Design → Build in 4 Weeks. With scope locked, selections confirmed, and the design approved, the build runs on a controlled schedule — one accountable team from start to finish.

Our Work

Why Homeowners

Choose Our Craftsmanship

Our focus on long‑lasting construction and

elevated design ensures every project adds

beauty, comfort, and value to your home.

Luxury Outdoor Living Spaces

Interlock & Stonework Excellence

Custom Swimming Pool Environments

Outdoor Kitchens & Dining Areas

Complete Backyard Makeovers

Start Your Design

Visualize your dream backyard before a single shovel hits the ground. We start with precise 2D plans, then transform them into photorealistic 3D renderings — so you can explore every detail with confidence before construction begins.

Conceptual Design Plan

Conceptual Design Plan

A technical 2D layout showcasing your modern pool, cabana, concrete paving, outdoor kitchen, and gazebo — designed for functionality and visual balance.

Enhanced Project Plan

Enhanced Project Plan

An upgraded concept incorporating a custom waterfall feature wall, elegant patio areas, integrated lighting, and a built-in bar for entertaining.

Photorealistic 3D Rendering

Photorealistic 3D Renderings

Immersive, lifelike visuals of your completed backyard transformation — see every material and finish exactly as it will appear in real life, including day-to-night views.

Summer 2026 spots are filling up.

Greenblock takes on a limited number of projects each season to protect quality and meet our completion guarantee. If your backyard needs to be ready this summer, now is the time to get qualified.

  • Spots available for summer 2026 builds

  • Free consultation — no commitment required

  • We'll tell you upfront if your property qualifies

Hundreds of
★ ★ ★ ★ ★
Happy Clients

We Service the Following Areas

Landscape construction throughout the Greater Toronto Area. Providing luxury landscape design & build services for backyard makeovers, swimming pool installations, outdoor kitchens and more.

Toronto

Markham

Unionville

Newmarket

Thornhill

Stouffville

Richmond Hill

Scarborough

Uxbridge

North York

Pickering

Keswick

Ajax

Whitby

Oshawa

Georgina

Courtice

Etobicoke

Mississauga

Mount Albert

Brampton

Oakville

Port Perry

Fully Licensed and Insured

Landscape Design & Build Services For Backyard Makeovers, Patios, Pool Installations & More

Serving the Greater Toronto Area Since 2004

[email protected]

Greenblock Property Services Ltd
4440 Brock Rd
Goodwood, ON L9P 1R4